Firestone is two towns stacked on one map: 1970s housing along the south side where the original main panel has outlived its breakers, and Carbon Valley subdivisions built since 2000 where a 200-amp panel is already full of circuits for a heat pump, a shop and an EV. Precision Service Electric replaces panels and upgrades services in Firestone, and takes the Town permit through the CitizenServe portal as part of the job. Call 970-593-3190.

Two Generations of Housing, Two Different Panel Problems
In the older south-side streets the panel is usually the last original piece of equipment in the house. A 100-amp service that was generous when the house had a gas range and no air conditioning has since absorbed central air, a dryer, a dishwasher and often a hot tub somebody wired on a Saturday. The breakers have been thrown enough times that the handles no longer sit squarely, and the panel cover carries the paint of three repaints.
In the newer subdivisions the equipment is sound and the arithmetic is the problem. A 200-amp panel with forty spaces fills up faster than anyone expects once an EV charger, a basement finish, a shop subpanel and a heat pump all arrive within a few years of each other.
The third case is failure rather than age: a main that trips with nothing running, a cover warm to the touch, a scorched neutral bar, the smell of hot plastic near the meter. Any of those is a reason to call rather than wait.
Repair, Replace, or Upgrade the Service
Not every panel problem is a panel replacement. A failed breaker, a loose neutral feeding one circuit, a lug that can be re-terminated — those are repairs, and doing them properly costs a fraction of a new panel. Federal Pacific Stab-Lok and Zinsco interiors are the exception: those designs are defective, not merely old, and new breakers in the old enclosure do not make either safe.
A service upgrade is the other distinction worth understanding before comparing quotes. Changing the panel swaps the box; changing the service changes the rating, which can involve new service-entrance conductors, a meter base and work on the utility side, depending on what is already installed and what the utility requires. A 200-amp panel behind a 100-amp service is still a 100-amp house.
What the Load Calculation Decides
Every quote that means anything starts from the same calculation: the code-defined floor area, the fixed appliances, heating and cooling, and the large motor circuits. That number decides whether this is a like-for-like replacement or a service upgrade, and the gap between them is thousands of dollars.
Firestone has one input that is easy to miss. The older properties frequently have a detached garage, a shop on its own slab or an irrigation pump on a shared meter, and anything fed from the house service belongs in the total. Leaving it out produces a panel that is compliant on paper and short on a July afternoon.
Permits in Firestone
The Town of Firestone Building Division at 9950 Park Avenue, 303-833-3291, reviews the plans, issues the permit and performs the inspection — the division does all three in house rather than handing inspection to a third party, and applications run through the CitizenServe portal. Firestone works to the 2023 National Electrical Code alongside the 2018 I-Codes.
Two licence mechanics catch out-of-area crews. Electricians need a Town of Firestone contractor licence, which carries no fee, but requires proof of state licensure and a certificate of insurance naming the Town as both certificate holder and additional insured — renewed annually. And the permit fee is not one number: the Town’s published schedule sets residential electrical fees by house size and carries a separate fee for a 100-to-200-amp single-phase service replacement, with the Building Division confirming the applicable fee and any plan review.
The fire district is not the permit authority for this work. The Frederick-Firestone Fire Protection District’s own fee schedule states that its permits are not required to construct, remodel or renovate one- or two-family homes or townhomes — which is why a residential panel job is a Town permit, not a district one.
Coordinating With United Power
Firestone’s electricity comes from United Power, a member-owned co-operative, not from Xcel. That matters on a service upgrade and it barely matters on a like-for-like swap: a service change means the co-op reviews the change, pulls the meter and reconnects, and the outage window belongs to their schedule rather than ours.
We say so in the estimate rather than on the morning of the work. For a panel-only replacement we coordinate any disconnect and reconnect the co-op requires, and a straightforward replacement is often completed in one working day.
Grounding and Surge Protection While the Cover Is Off
Replacing service equipment is when the grounding electrode system gets inspected properly: the electrodes the property actually has, the water-pipe bond where one is required, the equipment grounding conductors and the bonding of metal gas piping. In a house that has been extended twice, this is where the surprises live.
Where the adopted code requires it, replacement service equipment also has to include a listed surge protective device. It is a requirement rather than an upsell, and it costs far less to fit while the cover is already open.

What Install Day Looks Like
A like-for-like panel replacement is normally one working day: power off, old equipment out, new panel on the wall, every circuit re-terminated and labelled, cover on, inspection requested. A service upgrade stretches across the co-op’s involvement — meter base, drop, inspection, reconnect — so it runs across more than a day and part of that time is not ours to control.
What Moves the Price
Like-for-like versus upgrade is the largest variable. After that: whether the meter base and service-entrance conductors are replaced, the condition of the existing wiring where it lands in the new panel, whether the panel must move to meet working clearance, the run to a detached garage or shop, access and drywall repair, and the permit fee.
A panel in a finished basement wall and a panel on a garage wall are not the same job, and a quote that treats them as one changes as soon as somebody opens the wall.
Related Work in Firestone
If the reason for the panel is a car, the EV charger installation in Firestone page covers circuit sizing and the Town’s submittal list. If it is standby power, the transfer switch lands in this panel and the Firestone generator page covers that side. A finished basement adds circuits too — see basement electrical finishes in Firestone — and a whole house fan may need its own circuit, depending on the unit and the existing wiring. For the same scope in a neighbouring town, read the Longmont panel page or start from our service area.


“These guys ran a couple of 240 lines for a hot tub and some kitchen equipment, they did great work. Clean, tidy, solid components. We will use them again 100% Corey was easy to work with and right on schedule.”
Frequently Asked Questions
Do I need a Town permit to replace a panel in Firestone?
Yes. Electrical changes are permitted work in Firestone, applied for through the Town Building Division’s CitizenServe portal and inspected by Firestone inspectors. We file it as part of the job.
How long is the power off?
A like-for-like swap is usually one working day. A service upgrade adds the meter base, the United Power disconnect and reconnect, and an inspection between them, so it runs longer and depends partly on the co-op’s schedule.
Can you replace the panel without upgrading the service?
Yes, and that is the right scope whenever the load calculation says the existing rating is adequate. It is also the cheaper job — but a new panel on the same service does not add capacity.
Why is my permit fee different from my neighbour’s?
The Town’s schedule sets residential electrical fees by house size and carries a separate fee for a 100-to-200-amp single-phase service replacement, with plan review possible on top. The permit is priced on the property, not on the quote.
Who disconnects the power for a service upgrade?
United Power, because they supply Firestone — the Town permits the work and the co-op controls the meter and the reconnect. We schedule that with them before the install date.
Does a panel replacement need a fire district permit?
No. The Frederick-Firestone Fire Protection District’s fee schedule states its permits are not required for one- or two-family homes or townhomes.
Request a Panel Quote in Firestone
A photo of the open panel and the service label is enough to start from real numbers rather than a range. Precision Service Electric is family owned, in business 30 years, licensed and insured under Colorado license #3918, factory-trained and an authorized Generac dealer, and rated 4.8 stars across 47 Google reviews. Call 970-593-3190 or request a quote.